Séléction de nos meilleurs installations en France (avec au moins trois sites, les techniciens d'EDF nous a donnés 11 sur 10 pour la qualité de nos installations)
Selection of our best installations in France (not saying we have bad ones, but with us, our standard work is excellent... EDF say so, as have already received 11 out of 10 for all our turbine installations)
Since starting out in 1978, Derek has been responsible for installing or supplying over 2700 wind turbines worldwide Westwind #2 dept 56 | | Another 10KW westwind this time with our new super inverters | (5 Pictures) |
| Montana dept 56 | | New installation with Fortis Montana and AEOCON inverter | (4 Pictures) |
| Ex WEOLE (56) | | The other company installed and could NOT parameter the inverters.... AMI asked to go to site and now... take over! | (3 Pictures) |
| Moréac (56) | | Chinese turbine in grid connect BUT our first EMMA installation in FRANCE | (8 Pictures) |
| WES30, the big banger | | Never thought one day we'd be asked to install such a big turbine... two blades each of FOURTEEN meters long (ouch!) | (3 Pictures) |
| Braun 5KW (22) | | Installation in Dec 2010 at Pleudihen sur Rance | (7 Pictures) |
| Lesné (35350) | | Travere Industries sold a turbine and only delivered a mast... customer ordered a Braun, special adaptors, and 2 WB3300 installation. 12/2010 | (9 Pictures) |
| Presse | | What the press say about A.M.I. | (3 Pictures) |
|
The highest rated images: Rank | Picture | | Rating | Number of votes | 1. | | | 10,00 | 1 | 2. | | | 10,00 | 1 | 3. | | | 10,00 | 1 | 4. | | | 10,00 | 1 | 5. | | | 10,00 | 1 |
Color caption: Normal | Not rated yet | Green | 8 points or more | Yellow | 6 to 8 points | Dark yellow | 4 to 6 points | Orange | 2 to 4 points | Red | less than 2 points |
|